Separated Bike Lanes: How a Dutch Intersection Works

This is the final post in our series covering separated bike lanes. Previous posts covered the options available for providing them and their low impact development (LID) stormwater implications. This post will address how to handle and maintain separated bike lanes at an intersection with the use of a Protected Intersection, a.k.a. Dutch Intersection, on a project.

READ MORE

Did you learn your lesson?

Inspection on your project should consist of a combination of quality control and quality assurance. This process is on-going and the end result is a project completed to specification with an acceptable level of quality.

READ MORE

Is Your CM/GC Contractor Self-Performing Too Much Work?

Owners are increasingly considering alternative project delivery methods such as engineer-procure-construct (EPC), design-build, and construction manager/general contractor (CM/GC). While the advantages and disadvantages of the EPC method were discussed in a previous post, my personal experience lies more with CM/GC contracts. There are a variety of advantages and disadvantages to CM/GC, but in my experience it is extremely important for owners to realize that it is not in your best interest for the CM/GC to self-perform a high percentage of the work.

READ MORE